Manager Plant Engineering

Industry

Engineering

Advert ID

FOX_BBBH165118

Location

Rotterdam

Job Type

Permanent

Hours

Full-Time

Salary Range

Up to USD0.00 per year

No. of Openings

1

Branch Information

Houston Engineering - (USA) SPACES CityCentre One 800 Town & Country Boulevard TX Houston , TX 77024

ContactNumber

-

Job Description

Responsible for the management, direction and coordination of the Engineering department(s) at strategically key and technically complex supported site(s). Manage with an operational excellence philosophy, seeking continuous improvement of site operations.



Key Responsibilities:



Support the Effective and Efficient Operation of the supported site(s):



Develop, manage and maintain the Capital Budget for the supported site, ensuring that priority, schedule and cost goals are met.



Manage the allocation of resources to meet the goals and priorities of the site(s).



Minimize costs, waste and utilize resources efficiently throughout the site.



Maintain compliance to Engineering Standards



Excel in Environmental, Health and Safety Performance:



Maintain and improve the site's assets to reduce the probability of a major incident at the site.



Manage engineering systems, which improve EHS performance - LOTO drawings, P&IDs, site drawings, maintenance records, Title V records, safety interlock testing records, piping and valve specifications, etc.



Reduce the injury rates on the site, striving for zero injuries.



Reduce the number and severity of spills on the site, striving for zero spills.



Provide competency in PHA/LOPA efforts on projects, to ensure the most inherently safe design.



Continuously Improve the Performance of the supported site(s):



Continuously identify areas for potential improvement, or alternative solutions to business challenges within the department and the site(s). Seek to improve the use of resources, methods and tools used to conduct work activities within the Engineering Department to make them more streamlined and effective.



Introduce New Products or processes into the site(s) as quickly and effectively as possible through the Stage Gate process.



Use established maintenance improvement techniques such as root cause analysis, MTBF, CMMS metrics and analysis of operational data to reduce the number of repeat failures and improve equipment availability, knowledge, training and skills.



Seek ways to continue to reduce execution times for capital project